ZapSibNeftekhim

Ural Federal District

Commissioning: 2019-2026

Construction

Russia's Largest Petrochemical Complex

12,432
reinforced concrete piles
1,651
reinforced concrete columns
27,999 m3
of ready-mixed concrete
149 tons
of steel structures
45,548 m3
Cast-in-Place Reinforced Concrete Structures
4,620 m
Laying of Underground Pipelines
143,731 m3
Sand Backfilling
895 m3
Cast-in-Place Reinforced Concrete Wells

ZapSibNeftekhim is one of the largest and most technologically advanced projects in modern petrochemistry, which has become a key element of Siberia's industrial potential. 2MTPA Hydrocarbon-to-Polyolefin Deep Conversion Complex combined advanced engineering solutions, its own production of structures and a high level of construction management.

West Siberian Crude Hydrocarbon Advanced Processing Complex

Construction period: January 2016 – August 2019

A significant amount of products from Mostostroi-11's own workshops (Mostootryad-36 and Mostootryad-87) were used in the construction, which made it possible to maintain full control over the quality and timing of work.

Propane and Propylene Derivative Dehydrogenation-Based Polypropylene Production Facility (DGP-2)

Construction period: 01.04.2024 г – 29.08.2026

In 2024, work began on the following stage: "Construction of a new Propane and Propylene Derivative Dehydrogenation-Based Polypropylene Production Facility (DGP-2) (41 facilities, 35,480 m3 of cast-in-place concrete).