Engineers deployed 1,500 sensors and a Sapsan high-speed train with some of its cars retrofitted as a mobile laboratory to analyze rolling stock impact on HSR infrastructure.
The train completed 210 test runs: 130 along the main track at speeds up to 230 km/h, and 80 trough turnouts at speeds up to 140 km/h. Throughout the testing period, engineers collected over 35 TB of data.
"The cornerstone of the ballastless track is the NGP 4.0 rail slab, developed in-house by NPS. Throughout the test runs, the slab's structural design proved its worth, with zero deformation detected," said Ivan Ulanov, Deputy CEO of NPS-High-Speed Technologies.
The NGP 4.0 rail slab technology is second to none, with no equivalents globally. The concrete-polymer composite structure is engineered to withstand high dynamic loads across a wide temperature range, from −50°C to +50°C.
The upcoming phase of testing will take place on the Moscow–Tver HSR section, where the new rolling stock is set to accelerate to a design speed of 360–400 km/h.