To directly connect to Terminals B and C, the builders laid a connecting railway line that is more than 3 kilometres in length. To separate the traffic flows, two flyovers were built, 1.6 kilometres and 0.6 kilometres long.
30-40 min
aeroexpress train interval
> 3 km
railway line length
2 flyovers
1.6 km and 0.6 km long

Aeroexpress Train Station in Sheremetyevo's Northern Terminal provided a convenient and fast connection between the country's largest airport and downtown Moscow. The construction of the facility was completed by Natsproektstroy companies in June 2022.

To directly connect to Terminals B and C, the builders laid a connecting railway line that is more than 3 kilometres in length. To separate the traffic flows, two flyovers were built, 1.6 kilometres and 0.6 kilometres long.

A two-storey station was erected, designed to meet the needs of all categories of passengers. The building was equipped with ticket offices, a waiting lounge, lifts, travolators and escalators.

A direct rail connection has made the airport more accessible. The capacity of the new station is about 6,000 passengers per hour, or 10 million passengers per year.